Projects → Risks → Assigning a risk
Risks can be assigned to team members. If you want the risk to be tracked alongside tasks and assignments associated with the item, you should change the risk into a work item.
To assign a risk
Copyright © 2003–2009 Serena Software, Inc. All rights reserved.