This section describes a typical successful flow using release trains.
The flow you use in your implementation may be different.
The steps in this section assume that
Release Control
has been installed and configured, and that release elements have been created
using the steps in
Creating Release Elements.
- Create the release train.
- Create standalone release packages.
- Complete construction on the release packages.
- Deploy and validate release packages through the pre-Production
environments in the deployment path.
- Deliver production-ready release packages to the release engineering
team for acceptance.
- Optionally organize the release packages in a logical parent/child
hierarchy for attachment to a release train.
Tip: This is typically done in preparation for deploying
the release train, and is therefore done after candidate release packages have
been tested through test environments in a pre-production deployment path. Once
it has been determined which release packages are ready to be released as part
of a particular release train, the release package hierarchy can be added to
the release train.
- Add all standalone and parent release packages targeted for this
release to the release train.
Tip: Ensure the top-level release packages are associated
with the production deployment path.
- Verify and send the release train for release approval.
- Initiate deployment so the release packages are deployed to
production on their scheduled date.
After release package deployment to production is verified, the release
train is closed by the release manager or a release engineer.