Use this dialog box to merge two projects A and B into a third project C, or into the first project A.
Use the General tab to specify the projects to be merged.
See Options Tab for a Project for how to specify project flags, and to identify named branches for future revisions.
General Tab
Field |
Description |
Rules and Guidelines |
First Project Selector |
Select a product and project from the lists, or check Use Default Project or Use Current Project to select the default or current project. |
The Use Default Project check box or the Use Current Project check box is selected automatically if the Product and Project lists specify your default or global project. |
Second Project Selector |
Select a product and project as described under First Project Selector. |
|
Target Project Selector |
Select a product and project as described under First Project Selector. |
If you do not specify a target, the projects are merged into the first project. |
Report Only |
Select to only report whether the proposed merge operation is valid, without performing the merge. |
|
Related Topics