A
blackout can be set at the global environment level or
application environment level. Once set, no deployments or snapshots can be
scheduled to occur in the designated environment.
To set up a blackout:
-
In
Deployment, in the global menu, click
Schedule and then select one of the
Blackout options as follows:
- Application Environment Blackout
- Global Environment Blackout
-
Follow the
Schedule Blackout wizard to make your
selections. Selections are relevant for application or global environments,
depending on at what level you are adding the blackout.
-
Select an environment for which to set the blackout.
-
Select the date and time range for which you want the blackout to
remain in effect. Optionally, you can enter a name for the blackout.
-
Click
Submit.
In the Timeline, the blackout dates now have a black icon to
indicate a blackout has been set. An
A or
G indicate the environment level for the blackout,
application or global. In the Timeline grid or table view you can view, edit,
or delete the blackout.
Important: If any previously-scheduled deployments to the
environment are within the blackout date range, they will fail.
Copyright © 2011–2019 Micro Focus or one of its affiliates. All rights reserved.