Use this dialog box to merge two projects A and B into a third project C, or into the first project A.
Use the General tab to specify the projects to be merged.
See Options Tab for a Project for how to specify project flags, and to identify named branches for future revisions.
General Tab
| Field | Description | Rules and Guidelines | 
| First Project Selector | Select a product and project from the lists, or check Use Default Project or Use Current Project to select the default or current project. | The Use Default Project check box or the Use Current Project check box is selected automatically if the Product and Project lists specify your default or global project. | 
| Second Project Selector | Select a product and project as described under First Project Selector. | 
 | 
| Target Project Selector | Select a product and project as described under First Project Selector. | If you do not specify a target, the projects are merged into the first project. | 
| Report Only | Select to only report whether the proposed merge operation is valid, without performing the merge. | 
 | 
Related Topics