A work item, once created, can be converted to another agile work item (if that becomes necessary).
- Open the Projects module.
- Select the Work Items tab.
- Click New Work Item.
- In the New Work Item dialog box, enter a name. The following fields are optional: Start (Plan), Finish (Plan), Duration (Plan), Work (Plan), Cost (Plan), Remaining Work, Percent Work Complete, and Description.
- Click OK.
Edit
You can modify the contents of a backlog. Enable inline edit, select the work item, and make your changes. If you want to exit without saving, while in inline edit mode, click Edit.
- Select a backlog.
- In the backlog toolbar, click Edit (to enable inline edit).
- Select the row which contains the agile work item you want to edit and click in a column.
- Make your changes.
- Click Save.
- Click Edit (to disable inline edit).
Move
You can move a work item from one backlog into another. When backlogs are side-by-side in the same view, you can select a work item in one backlog and drag it into the other.
- Open the Backlogs module.
- Select a project, release, or sprint. And then select a backlog view for that work type.
- In the backlog view, select the backlog to which you want to move the work item.
- Drag the work item into the backlog.